FEED, what is it, and when is it needed
- Joshua Hawley
- Jan 10
- 3 min read
Updated: Jan 20

IGA Staff, Jan 10, 2025
A Project FEED (Front-End Engineering Design) report is a critical document used in the early stages of project planning. It serves as a foundational document for detailed design and engineering, providing a basis for the final investment decision (FID) and contract bidding for the execution phase, which includes Engineering, Procurement, and Construction (EPC).
Key Components of a FEED Report
Block Flow Diagram (BFD): High-level diagrams showing the general flow of facility processes and equipment. They provide a simple roadmap of how the facility operates and how the product moves through the facility.
Process Flow Diagram (PFD): Detailed diagrams that show how piping and processing equipment interact with instrumentation and control devices. These diagrams help engineers and facility operators troubleshoot issues and plan scheduled maintenance once the facility is operational.
Piping and Instrumentation Diagrams (P&IDs): Detailed schematics of all piping and instrumentation within the facility. These are used to build the facility’s control systems and address any issues once the facility is operational.
Facility Plot Plan: An aerial view of the facility, including roads, equipment, buildings, and surrounding land. It helps with planning construction and ensuring safety clearances.
Technical Specifications: Reports that provide overall specifications of the facility, including input and output capacities of equipment. These guide operations and help in optimizing equipment capacity.
Structural Drawings: Detailed drawings and designs that specify where structural elements like concrete, beams, or foundations should reside. These are primarily used during the construction phase.
3D Drawings: Drawings that show the placement and routing of all piping within the facility. They provide directions for building the piping during construction and help troubleshoot issues during operations.
Electrical Diagrams: Detailed schematics of all electrical systems in the facility, used to build control systems and address issues once the facility is operational.
Cost Estimates and Budgets: Accurate cost estimates and budget summaries are included, typically with an accuracy range of +/- 15 to 30%.
Project Execution Plan: A plan that outlines the detailed engineering and procurement schedule, construction schedule, and basis and assumptions for the project.
Environmental Documents: Reports that address environmental considerations, including noise data, fire hazard analysis, and other regulatory requirements.
Importance of a FEED Report
The FEED report is crucial for ensuring that the project will produce an operational asset for the organization. It provides shareholders with crucial budgetary and technical details that are key to the approvals process, proving that the capital outlay will be a wise investment. Additionally, it maps out the details of the project between the client and the Engineering, Procurement, and Construction (EPC) contractor, facilitating a positive relationship between the two parties.
Example: Cattle Feed Industry Project Report
For a specific industry like the cattle feed industry, a project report would include detailed information on the manufacturing process, machinery requirements, raw materials, and cost analysis. For instance, a cattle feed plant project report would cover the acquisition and processing of raw materials, such as cereals, oilseeds, protein sources, and other additives. It would also detail the various types of feed plants, ranging from basic mixing plants to fully automated facilities, and provide cost estimates and financial projections.
Conclusion
A well-executed FEED report is essential for the successful execution of engineering projects, ensuring that all client-specific requirements are met and minimizing significant changes during the EPC phase. It provides a comprehensive overview of the project, including technical specifications, cost estimates, and detailed documentation, making it a critical tool for pre-project planning and budgeting.